Over the time that the Friends have been in existence we have managed to help with many projects in the church. The first was to help with work required on the South Porch and Boiler House and the next to restore the Hatchments which hang in the Cheney Chapel.
After this came the very much larger project of the restoration needed on the tower. This had become necessary as the tower had deteriorated. Victorian restoration had meant that the fabric was in a poor state and the Totternhoe stone had weathered badly. The total cost was going to be around £400,000. The Heritage Lottery fund agreed to pay 75% but the rest had to be found by church. A Critical Conservation Appeal was set up with Lady Bowman-Shaw as the Chairman. Through targetted fund-raising we managed to be able to provide grants totalling £65,000 towards the costs. A book with the names of those who donated was produced to commemorate this wonderful achievement.
In 2012 we were able to give a grant of just under £8,000 to Toddington PCC towards the replacement of the pew plinths. These were badly in need of repair and the church looks much smarter with its new flooring.
Since December 2017 we have funded a lot of work needed on the South Wall and windows, paid for the replacement of the boilers (which both gave up just as we were approaching winter 2018), helped to fund an alarm to protect the lead on the church roof (which otherwise was going to be uninsurable) and have contributed towards the upgrade of the organ – a total of more than £70,000.
Overall we have given grants totalling over £210,000.